Riverhurst Irrigation District, Riverhurst Irrigation Pump House P7 Pump Addition

Author: Mock Webware |

This project included 138kv power wiring to feed a new power transformer, 15kv cable duct form transformer to new switchgear. A VFD and all instrumentation and controls required to automatically monitor and control the transformer and pump drive. Instrumentation included for the monitoring of the new pump motor. Design and construction of support steel for cable duct. Grounding systems for all new equipment. This project began in the fall of 2015 and was operational in April of 2016. Approximate contract cost was $500,000.00. This contract was controlled by MPE Engineering.