• AREVA, McClean Lake Operations Permanent Camp

    Author: Mock Webware |

    Construction of 140 man state of the art permanent camp, geothermal heat throughout, ICF construction, motor control, data, fire alarm systems, mill engineering maintenance electrical construction

    CLICK HERE TO READ THE FULL ARTICLE »


  • Cameco, Cigar Lake Operations

    Author: Mock Webware |

    Extensive work on this site as well, involved new propane farm installations, pump houses, massive freeze system expansion, surface and underground work, new maintenance office/ equipment shop maintenance facility and many other projects.

    CLICK HERE TO READ THE FULL ARTICLE »


  • Cameco, Key Lake Operations

    Author: Mock Webware |

    Complete site wide fire alarm system swap and upgrade all buildings to current fire code compliant systems, sapphire system, deluge and pre-action systems, commissioning work on the new calciner building and water treatment plant expansion project.

    CLICK HERE TO READ THE FULL ARTICLE »


  • Cameco, McArthur River Operation

    Author: Mock Webware |

    Underground substation renovation, large twin power feed project to double capacity of one section of the mine, cable tray replacement, surface heat trace projects, installation of many miles of cable and conduit to feed from the new 230kv substation to various points on site, many more projects have been completed successfully and are too numerous to list.

    CLICK HERE TO READ THE FULL ARTICLE »


  • Cameco, Rabbit Lake Operations

    Author: Mock Webware |

    Work on this site was extensive from 2006-2014 continuous – all services from basic site services to the entire mill DCS system replacement, instrumentation, substations, fire alarm systems throughout the entire site, commissioning.

    CLICK HERE TO READ THE FULL ARTICLE »


  • Cigar Lake Maintenance and Office Complex

    Author: Mock Webware |

    30,000 ft2 building, c/w offices throughout the second level, training rooms, workshops, oil storage rooms, battery storage rooms, server room, large mechanical room, and electrical rooms. 3 overhead cranes, cable tray system throughout, motor control centers, 5kv – 600v transformer, fibre optic communications throughout, data system, fire alarm system.

    CLICK HERE TO READ THE FULL ARTICLE »


  • City of Regina Ice Arena Lighting Upgrades

    Author: Mock Webware |

    Upgrade of existing lighting to LED lighting over the ice surface of 4 rinks utilizing the SaskPower rebate program. Ice Arenas upgraded include Jack Staples, Murray Balfour, Clarence Mahon, and Jack Hamilton.

    CLICK HERE TO READ THE FULL ARTICLE »


  • Clearwater First Nation WTP Upgrade

    Author: Mock Webware |

    This project involved a large expansion on the existing WTP, including all filters, pumps, instrumentation, controls, and emergency power systems. Also included in this contract was installation of a new PLC c/w all programming required. The approximate cost of this project was $350,000.00. The contract controller was Associated Engineering.

    CLICK HERE TO READ THE FULL ARTICLE »


  • Cumberland House Sewage Pump Station Upgrade

    Author: Mock Webware |

    This project consisted of the demolition and construction of a new automated SPS within the community. The work included all controls and automation, power, lighting, and emergency power generator. The approximate cost of this contract is $150,000.00. The project was controlled by Bullee Consulting.

    CLICK HERE TO READ THE FULL ARTICLE »


  • Golden Band Jolu Generator Systems

    Author: Mock Webware |

    Inspected and energized power to the site via generator systems after being decommissioned for over 10 years. There was much vandalism and copper theft, so this was a time consuming project.

    CLICK HERE TO READ THE FULL ARTICLE »


  • Hatchet Lake First Nation Water Treatment Plant Upgrade

    Author: Mock Webware |

    This project involved a large expansion on the existing WTP and pumphouse building, including all filters, pumps, instrumentation, controls, and emergency power systems. The approximate cost of this project was $1.8M. The contract controller is Associated Engineering and ATAP. The project was kicked off in the fall of 2016 and completion in December 2017.

    CLICK HERE TO READ THE FULL ARTICLE »


  • Infrastructure projects throughout Saskatchewan

    Author: Mock Webware |

    Water Treatment Plant expansions, Water Booster Pump Houses, Sewage Pumping Stations and remote well sites c/w radio communications.

    CLICK HERE TO READ THE FULL ARTICLE »


  • Lake Manitoba First Nation, Manitoba – Waste Water Treatment Plant and Sewage Pump Station

    Author: Mock Webware |

    This project was for a complete new treatment building for the First Nation. This project included all major power, emergency backup generator, MCC, instrumentation, and controls required. This project began in the fall of 2016 and is complete February of 2018. Approximate contract cost was $700k. This contract was controlled by JRC Engineering.

    CLICK HERE TO READ THE FULL ARTICLE »


  • Mosaic Belle Plaine Cooling Pond Pedestal Feeder Replacement

    Author: Mock Webware |

    Pond Feeder Replacement project; included in this project was approximately 3.5km of 750mcm/3c 25kv Airguard cable and fibre optic cable to replace the existing aging cabling. This project was very complex, simply based on the fact that in approximately a 1km area we had 90 utility crossings to execute; the project was completed without any incidents. Also completed on this site, fire alarm detection systems, as well as Sapphire system and thermowire detection system installations.

    CLICK HERE TO READ THE FULL ARTICLE »


  • Mosaic Belle Plaine Pond Feeder Replacement

    Author: Mock Webware |

    Included in this project was approximately 3.5km of 750mcm/3c 25kv Airguard cable and fibre optic cable to replace the existing aging cabling. This project was very complex, simply based on the fact that in approximately a 1km area we had 90 utility crossings to execute; the project was completed without any incidents. Also completed on this site, fire alarm detection systems, as well as Sapphire system and thermowire detection system installations. This project was managed directly by Mosaic Belle Plaine.

    CLICK HERE TO READ THE FULL ARTICLE »


  • Mosaic Colonsay Underground Diesel Bay

    Author: Mock Webware |

    Underground diesel bay construction consisting of a very large underground diesel mechanic’s bay for maintenance on underground equipment. This contract included 15kv sled connections, all lighting, small power, equipment connections, power distribution skids, overhead crane wiring, etc. (Nov 2014-Feb 2015). Also on this site we have completed fire alarm Sapphire system installations and storage barn conveyor fire detection.

    CLICK HERE TO READ THE FULL ARTICLE »


  • Novozyme Biologicals, Saskatoon

    Author: Mock Webware |

    Complete electrical installation of 100,000 ft2 building. All motor control and power wiring for the construction of the production areas. Many freezer and cooler systems, data system, fire alarm system, ongoing maintenance ever since the construction was completed.

    CLICK HERE TO READ THE FULL ARTICLE »


  • O’Chiese First Nation, Rocky Mountain House, AB – New School Water Treatment Plant

    Author: Mock Webware |

    Complete installation of all electrical, automation, controls, and emergency power systems for this new facility. This new facility is to service a new subdivision of the reserve, as well as the newly built school. Project kick off was in winter of 2015 and was completed in fall of 2016. Approximate value of this contract was $600K.

    CLICK HERE TO READ THE FULL ARTICLE »


  • PCS Allan Skip & Shaft Basement

    Author: Mock Webware |

    Underground electrical wiring for the replacement skip and shaft basement steel replacement; fire alarm system installations.

    CLICK HERE TO READ THE FULL ARTICLE »


  • PCS Lanigan

    Author: Mock Webware |

    15kv cable tray replacement, fire alarm system c/w sapphire systems.

    CLICK HERE TO READ THE FULL ARTICLE »