Mosaic Belle Plaine Cooling Pond Pedestal Feeder Replacement
Pond Feeder Replacement project; included in this project was approximately 3.5km of 750mcm/3c 25kv Airguard cable and fibre optic cable to replace the existing aging cabling. This project was very complex, simply based on the fact that in approximately a 1km area we had 90 utility crossings to execute; the project was completed without any incidents. Also completed on this site, fire alarm detection systems, as well as Sapphire system and thermowire detection system installations.