• Prince Albert City, Water Treatment Plant – Filters 2, 3, 4 and 5 Replacement

    Author: Mock Webware |

    This project included all instrumentation and controls required to automatically monitor and control the city water filtering systems. It included demolition of the existing systems, and installation of all new cabling, tray, controls, instruments, and control platforms. This project began in the spring of 2016 and is scheduled for completion in spring of 2018. Approximate contract cost was $250,000.00. This contract was controlled by AECOM.

    CLICK HERE TO READ THE FULL ARTICLE »


  • Prince Albert Sewage Pump Station Upgrades, Phase 1 and 2

    Author: Mock Webware |

    This project involved the upgrades of many SPS buildings throughout the city of Prince Albert. Included in the work was a large amount of instrumentation, controls, PLC systems installations and wiring, as well as emergency power systems throughout. Approximate duration of this work was 2.5 years and 8 stations. Approximate cost of this contract was $2M. This project was controlled by Bullee Consulting.

    CLICK HERE TO READ THE FULL ARTICLE »


  • RCMP Forensic Laboratory Renovation

    Author: Mock Webware |

    Renovation to the main and second floor of the Forensic Laboratory with installation of new low voltage lighting control systems, public address and sound masking systems. This was a staged renovation to accommodate tenant with minimal impact and disruption to their services

    CLICK HERE TO READ THE FULL ARTICLE »


  • Riverhurst Irrigation District, Riverhurst Irrigation Pump House P7 Pump Addition

    Author: Mock Webware |

    This project included 138kv power wiring to feed a new power transformer, 15kv cable duct form transformer to new switchgear. A VFD and all instrumentation and controls required to automatically monitor and control the transformer and pump drive. Instrumentation included for the monitoring of the new pump motor. Design and construction of support steel for cable duct. Grounding systems for all new equipment. This project began in the fall of 2015 and was operational in April of 2016. Approximate contract cost was $500,000.00. This contract was controlled by MPE Engineering.

    CLICK HERE TO READ THE FULL ARTICLE »


  • SaskPower

    Author: Mock Webware |

    We have completed many successful projects in the past for SaskPower as a subcontractor such as: Edam Switching Station Civil – all in ground grid, fence grounding, structure grounding, and testing of the grid (all cad-welding) - subcontract to Points Athabasca Contracting -Points North Substation Expansion – reworked ground grid and structure grounding (cad-welding)- subcontract to Points Athabasca Contracting -Security System Installations (cameras, motion detectors, door entry systems, all cabling) on the following Switching station sites ; Condie, Poplar River, Boundary Dam, Aberdeen, Beatty, Coteau Creek, Regina South - subcontractor to Tyco Integrated Security (SimplexGrinnell).

    CLICK HERE TO READ THE FULL ARTICLE »


  • Sask Power EB Campbell Hydro Station

    Author: Mock Webware |

    Fire Protection Upgrades – this project included the complete design, engineering, and construction of a new fire suppression and detection system through the site. Incorporated was multiple Victaulic Vortex hybrid water mist systems through the generators, as well as wet sprinkler systems in many common areas. Detection and releasing duties were completed through multiple panels, all networked together to provide a modern fire detection system, including Fenwal heat detection and Protectorwire systems throughout. The majority of the work was required to be completed during multiple shutdowns with strict completion dates and no lost production. This project carries a value of…

    CLICK HERE TO READ THE FULL ARTICLE »


  • Sask Power Poplar River Contractor’s Shop / Office Facilities

    Author: Mock Webware |

    This project included the complete electrical systems for this shop / office addition to the existing facility; electrical distribution, lighting, overhead crane, small power, equipment feeds, cable tray, etc. required to give a completely functional building. The project began in the winter of 2016 and will be complete in the spring of 2017.

    CLICK HERE TO READ THE FULL ARTICLE »


  • VALE – T3 Shaft Feeder Cable Installation

    Author: Mock Webware |

    Included in this project was installation for two 750mcm/3c 15kv Airguard cable and grounding cables to increase the underground substation capacity. As part of the project, included was cable tray systems, and installation of multiple 15kv JBs on multiple levels in the mine. This project was extremely complex because of the aging shaft steel and the extreme weight of the cable down the shaft; all cable was installed from top down using special installation methods; the project was completed without any incidents. This project was managed directly by VALE.

    CLICK HERE TO READ THE FULL ARTICLE »


Top